About Batch Size Optimisation Calculator
The economic batch quantity balances setup cost against inventory holding cost: EBQ = sqrt(2 x annual demand x setup cost / annual holding cost per unit). Holding cost per unit is unit value times the carrying rate, which covers capital, storage, insurance and obsolescence.
Formulas
Economic batch quantity
EBQ = sqrt(2 x D x S / H) where H = unit cost x holding rate
Total cost
Total relevant cost = (D / Q) x S + (Q / 2) x H
Worked example
With the default values below, Batch Size Optimisation Calculator returns Economic Batch Size of 3,000. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Annual Demandminimum 1 units
- 24,000 units
- Setup Or Order Costminimum 0.01 per batch
- 4,500 per batch
- Unit Costminimum 0.01
- 120
- Annual Holding Cost Rateaccepts 0.1–100 %
- 20 %
Results
- Economic Batch Size
- 3,000
- Batches Per Year
- 8.00
- Annual Setup Plus Holding Cost
- $72,000.00
- Annual Holding Cost Per Unit
- $24.000
Step by step
- 1Values used
- 2Economic batch quantity
- 3Total cost
- 4Economic Batch Size= 3,000
- 5Batches Per Year= 8.00
- 6Annual Setup Plus Holding Cost= 72,000.00
- 7Annual Holding Cost Per Unit= 24.000
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation or tax into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why is the total cost curve so flat near the optimum?
Setup and holding costs move in opposite directions, so a batch size 30% off the optimum typically raises total cost by under 5%. Round to convenient pack or pallet quantities without much penalty.
What if setup time can be reduced?
The optimal batch shrinks with the square root of setup cost. Halving setup cost cuts the batch by 29%, which is the mathematical case for quick changeover work.
Related Calculators
- Carton Size Optimisation Calculator
- Inspection Sample Size Calculator
- Order Quantity Split By Size Calculator
- Pallet Pattern Optimisation Calculator
- Sheet Cutting Optimisation Calculator
- Time Study Sample Size Calculator
- Work Sampling Study Size Calculator
- 5S Audit Score Calculator
- Accelerated Ageing Time Calculator
- Acceptance Number (AQL) Calculator
You might also need
- Carton Size Optimisation CalculatorAlso in Manufacturing, Packaging & Textiles
- Inspection Sample Size CalculatorAlso in Manufacturing, Packaging & Textiles
- Pallet Pattern Optimisation CalculatorAlso in Manufacturing, Packaging & Textiles
- Sheet Cutting Optimisation CalculatorAlso in Manufacturing, Packaging & Textiles
- Order Quantity Split By Size CalculatorAlso in Manufacturing, Packaging & Textiles
- Time Study Sample Size CalculatorAlso in Manufacturing, Packaging & Textiles