Developer Productivity Calculator

Measure delivery throughput and the share of capacity lost to unplanned work.

About Developer Productivity Calculator

Throughput per developer week conflates capacity with interruption. Separating focus time shows how much of the shortfall is unplanned work rather than productivity. These figures are useful for capacity planning within a team but not for comparing teams, since story point scales are not shared across them.

Formula

Developer Productivity

Throughput = points ÷ developer weeks; focus share = 100 − unplanned − meeting time

focus time
Time actually available for planned delivery work
developer week
One developer working for one week

Worked example

With the default values below, Developer Productivity Calculator returns Points per Developer per Week of 8.000. Change any input above and every figure here is recalculated in your browser.

Inputs used

Story points deliveredminimum 0
96
Developersminimum 0.1
6
Sprint lengthminimum 0.1 weeks
2 weeks
Share of time on unplanned workaccepts 0–100 %
30 %
Share of time in meetingsaccepts 0–100 %
20 %

Results

Points per Developer per Week
8.000
Share of Time Available for Planned Work
50.00%
Points per Focused Developer Week
16.000
Points Achievable Without Interruption
192.0
Points Lost to Interruption
96.0

Step by step

  1. 1Values used
  2. 2Developer Productivity
  3. 3Points per Developer per Week= 8.000
  4. 4Share of Time Available for Planned Work= 50.00
  5. 5Points per Focused Developer Week= 16.000
  6. 6Points Achievable Without Interruption= 192.0
  7. 7Points Lost to Interruption= 96.0

Assumptions and limits

  • The result is derived only from the 5 inputs listed above. Anything not among them is not part of the calculation.
  • In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
  • Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.

How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.

Frequently Asked Questions

How is Developer Productivity calculated?

Throughput = points ÷ developer weeks; focus share = 100 − unplanned − meeting time Throughput per developer week conflates capacity with interruption. Separating focus time shows how much of the shortfall is unplanned work rather than productivity.

Why does Developer Productivity matter?

These figures are useful for capacity planning within a team but not for comparing teams, since story point scales are not shared across them.

What values do I need to enter?

This calculator takes 5 inputs: Story points delivered, Developers, Sprint length, Share of time on unplanned work, Share of time in meetings. The pre-filled defaults are a realistic starting point — replace them with figures from your own environment for a result you can act on.