Gypsum Requirement Calculator
Work out gypsum requirement instantly with clear inputs, formula shown and shareable results.
About Gypsum Requirement Calculator
Reclaiming a sodic soil means replacing exchangeable sodium with calcium. The sodium to displace is CEC x (current ESP - target ESP)/100 in cmol/kg, and each cmol/kg needs 0.086 tonnes of pure gypsum per 100 tonnes of soil. Soil mass follows from the reclamation depth and a bulk density of 1.4 t/m3.
Formulas
Gypsum requirement
Exchangeable Na to replace (cmol/kg) = CEC x (ESP_current - ESP_target)/100
Mass basis
Gypsum (t/ha) = 0.086 x cmol/kg x soil mass (t/ha) / 1000; soil mass = depth (m) x 10,000 x 1.4
Worked example
With the default values below, Gypsum Requirement Calculator returns Gypsum Requirement of 0.54. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Current Exchangeable Sodium Percentageaccepts 1–100 %
- 25 %
- Target ESPaccepts 1–100 %
- 10 %
- Cation Exchange Capacityminimum 0.5 cmol/kg
- 20 cmol/kg
- Depth To Reclaimminimum 1 cm
- 15 cm
Results
- Gypsum Requirement
- 0.54
- Exchangeable Sodium To Replace
- 3.000
- ESP Reduction Targeted
- 15.00
- Mass Of Soil Treated
- 2,100
Step by step
- 1Values used
- 2Gypsum requirement
- 3Mass basis
- 4Gypsum Requirement= 0.54
- 5Exchangeable Sodium To Replace= 3.000
- 6ESP Reduction Targeted= 15.00
- 7Mass Of Soil Treated= 2,100
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Sodic soil reclamation requires adequate drainage; leaching displaced sodium without it can salinise adjacent land and shallow groundwater. Have a soil chemistry report interpreted by a specialist before large-scale application.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Sodic soil reclamation requires adequate drainage; leaching displaced sodium without it can salinise adjacent land and shallow groundwater. Have a soil chemistry report interpreted by a specialist before large-scale application.
Frequently Asked Questions
Does gypsum lower soil pH?
Only slightly. Gypsum swaps sodium for calcium and improves structure without acidifying. For a sodic soil that is also alkaline with free carbonate, elemental sulphur or acidified amendments are needed to move pH.
Is leaching needed after applying gypsum?
Yes. The displaced sodium must be flushed below the root zone with good-quality water and adequate drainage, otherwise it re-adsorbs and the reclamation fails.
Related Calculators
- Canal Flow Requirement Calculator
- Compost Requirement Calculator
- DAP Requirement Calculator
- Fish Feed Requirement Calculator
- Goat Feed Requirement Calculator
- Grazing Land Requirement Calculator
- Labour Requirement Per Acre Calculator
- Mulch Film Requirement Calculator
- Mushroom Spawn Requirement Calculator
- Potash Requirement Calculator
You might also need
- Compost Requirement CalculatorAlso in Agriculture, Livestock & Rural
- DAP Requirement CalculatorAlso in Agriculture, Livestock & Rural
- Potash Requirement CalculatorAlso in Agriculture, Livestock & Rural
- Transplanting Requirement CalculatorAlso in Agriculture, Livestock & Rural
- Urea Requirement CalculatorAlso in Agriculture, Livestock & Rural
- Canal Flow Requirement CalculatorAlso in Agriculture, Livestock & Rural