Plan a sectorised point-to-multipoint site: subscribers per sector, offered load, azimuth coverage and the subscriber ceiling.

Inputs

sectors
degrees
subscribers
Mbps
Mbps
:1

Subscribers per Sector

30.00

Offered Load per Sector

30.00Mbps

Sector Utilisation

10.0%

Subscriber Ceiling for the Site

1,200

Azimuth Covered

360degrees

Step by step

  1. Values used

    Sectors on the tower = 4 sectors; Azimuth beamwidth per sector = 90 degrees; Subscribers served by the site = 120 subscribers; Usable capacity per sector = 300 Mbps; Committed rate per subscriber = 10 Mbps; Oversubscription ratio = 10 :1

  2. Point-to-Multipoint

    offered load per sector = (subscribers ÷ sectors) × committed rate ÷ oversubscription ratio; subscriber ceiling = sectors × sector capacity × ratio ÷ committed rate.

  3. Subscribers per Sector

    = 30.00

  4. Offered Load per Sector

    = 30.00 Mbps

  5. Sector Utilisation

    = 10.0

  6. Subscriber Ceiling for the Site

    = 1,200

  7. Azimuth Covered

    = 360 degrees

How it works

Oversubscription works because subscribers do not all transmit at once, so the sector only has to carry the committed rate divided by the ratio. Inverting the same relationship gives the number of subscribers a sector can sell before the committed rates no longer fit. Point-to-multipoint sites fail commercially, not technically: sell one oversubscription ratio too aggressively and the sector saturates every evening at exactly the hour customers notice.

Formula

Point-to-Multipoint

offered load per sector = (subscribers ÷ sectors) × committed rate ÷ oversubscription ratio; subscriber ceiling = sectors × sector capacity × ratio ÷ committed rate.

ratio
Statistical oversubscription — how many sold megabits share one delivered megabit
azimuthCoverage
Sectors × beamwidth, capped at a full circle

Frequently Asked Questions

How is Point-to-Multipoint calculated?

offered load per sector = (subscribers ÷ sectors) × committed rate ÷ oversubscription ratio; subscriber ceiling = sectors × sector capacity × ratio ÷ committed rate. Oversubscription works because subscribers do not all transmit at once, so the sector only has to carry the committed rate divided by the ratio. Inverting the same relationship gives the number of subscribers a sector can sell before the committed rates no longer fit.

Why does Point-to-Multipoint matter?

Point-to-multipoint sites fail commercially, not technically: sell one oversubscription ratio too aggressively and the sector saturates every evening at exactly the hour customers notice.

What values do I need to enter?

This calculator takes 6 inputs: Sectors on the tower, Azimuth beamwidth per sector, Subscribers served by the site, Usable capacity per sector, Committed rate per subscriber, Oversubscription ratio. The pre-filled defaults are a realistic starting point — replace them with figures from your own environment for a result you can act on.