Rework Cost Calculator
Work out rework cost instantly with clear inputs, formula shown and shareable results.
About Rework Cost Calculator
Rework cost is labour hours at the loaded rate plus any additional material. It is an internal failure cost in the cost-of-quality framework, and because rework consumes bottleneck capacity the opportunity cost is often larger than the direct cost shown here.
Formulas
Rework labour
Labour = Units x (Minutes / 60) x Loaded hourly rate
Total rework cost
Total = Rework labour + Extra material
Worked example
With the default values below, Rework Cost Calculator returns Total rework cost of $5,141.33. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Units requiring rework
- 320
- Rework labour per unit
- 22 min
- Loaded labour rate
- 34
- Extra material per reworked unit
- 3.6
Results
- Total rework cost
- $5,141.33
- Rework labour cost
- $3,989.33
- Extra material cost
- $1,152.00
- Cost per reworked unit
- $16.07
Step by step
- 1Values used
- 2Rework labour
- 3Total rework cost
- 4Total rework cost= 5,141.33
- 5Rework labour cost= 3,989.33
- 6Extra material cost= 1,152.00
- 7Cost per reworked unit= 16.07
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- This is an estimate for general information and not professional financial, tax or legal advice. See the full disclaimer for the limits that apply to this kind of calculator.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why use a loaded rate?
Because rework consumes supervision, facilities and benefits, not just the base wage. A loaded rate is typically 1.3-1.6 times base pay.
Should I add lost capacity?
If the rework happens on a constrained resource, yes — value the displaced production at its contribution margin and add it.
Related Calculators
- Cost Of Goods Sold Calculator
- Cost Plus Pricing Calculator
- Cost Price From Margin Calculator
- Credit Period Cost Calculator
- Factoring Cost Calculator
- Labour Cost Per Unit Calculator
- Penalty Clause Cost Calculator
- Standard Cost Variance Calculator
- ABC Inventory Classification Calculator
- Accounting Rate Of Return Calculator
You might also need
- Factoring Cost CalculatorAlso in Business, Accounting & Operations
- Cost Of Goods Sold CalculatorAlso in Business, Accounting & Operations
- Cost Plus Pricing CalculatorAlso in Business, Accounting & Operations
- Credit Period Cost CalculatorAlso in Business, Accounting & Operations
- Penalty Clause Cost CalculatorAlso in Business, Accounting & Operations
- Standard Cost Variance CalculatorAlso in Business, Accounting & Operations