Flexible pavement thickness grows with the logarithm of design traffic and falls as subgrade strength rises. This chart approximation uses a 400 mm reference for 10 million standard axles on a CBR 5 subgrade and scales by (5/CBR)^0.4. The granular thickness left after the surfacing is split roughly 45 percent base and 55 percent sub-base.
Formulas
Total thickness
T mm = 200 x (log10 msa + 1) x (5 / CBR)^0.4
Layer split
Granular = T - surfacing; base = 45 percent of granular, sub-base the remainder
Worked example
With the default values below, Road Pavement Thickness Calculator returns Total pavement thickness of 400. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Subgrade CBRaccepts 1–40 %
- 5 %
- Design trafficminimum 0.1 msa
- 10 msa
- Bituminous surfacing thicknessminimum 10 mm
- 50 mm
Results
- Total pavement thickness
- 400 mm
- Granular layers thickness
- 350 mm
- Base course thickness
- 158 mm
- Sub-base thickness
- 193 mm
Step by step
- 1Values used
- 2Total thickness
- 3Layer split
- 4Total pavement thickness= 400 mm
- 5Granular layers thickness= 350 mm
- 6Base course thickness= 158 mm
- 7Sub-base thickness= 193 mm
Assumptions and limits
- The result is derived only from the 3 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to whole numbers, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Preliminary estimate only. Pavement design must follow the design guide adopted by the road authority and be verified by a qualified highway engineer.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Preliminary estimate only. Pavement design must follow the design guide adopted by the road authority and be verified by a qualified highway engineer.
Frequently Asked Questions
How is the Road Pavement Thickness figure worked out?
T mm = 200 x (log10 msa + 1) x (5 / CBR)^0.4. Flexible pavement thickness grows with the logarithm of design traffic and falls as subgrade strength rises.
Why does a weak subgrade cost so much thickness?
The pavement has to spread the wheel load until the stress reaching the subgrade is tolerable. Halving CBR raises the required thickness by roughly a third, which is why subgrade improvement often pays for itself.
What values do I need to enter?
This calculator takes 3 inputs: Subgrade CBR, Design traffic, Bituminous surfacing thickness. The pre-filled defaults are a realistic worked example — replace them with your own site or project figures.
Related Calculators
You might also need
- Base Course Thickness CalculatorAlso in Construction & Civil Engineering
- Raft Foundation Thickness CalculatorAlso in Construction & Civil Engineering
- Road Length Cost CalculatorAlso in Construction & Civil Engineering
- Aggregate Tonnage CalculatorAlso in Construction & Civil Engineering
- Asphalt Quantity CalculatorAlso in Construction & Civil Engineering
- Asphalt Tonnage CalculatorAlso in Construction & Civil Engineering