Work out sod quantity instantly with clear inputs, formula shown and shareable results.
Roll count is the area plus wastage divided by the area of one roll, which is typically about one square metre. Allow 5-10% for cutting around curves and edges, and lay within 24 hours of delivery because stacked turf heats up and dies quickly.
Turf quantity
rolls = ceil(area x (1 + wastage) / roll area)
Within 24 hours in warm weather, 48 at most. Rolled turf composts inside the stack and yellows or dies.
Stagger them like brickwork and butt them tightly. Gaps dry out and become weed entry points.