Development Charges Calculator
Work out development charges instantly with clear inputs, formula shown and shareable results.
About Development Charges Calculator
Development charges recover the cost of trunk infrastructure from new development and are commonly levied on both land area and built-up area, at different rates and often varying by zone and use. Expressing the total per built-up square metre makes it comparable with construction cost, where it typically adds three to ten percent.
Formula
Development charges
Total = built-up area x building rate + land area x land rate
Worked example
With the default values below, Development Charges Calculator returns Total development charges of $4,600,000.00. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Built-up areaminimum 0.01 m²
- 5,000 m²
- Development charge on built-up areaminimum 0 per m²
- 800 per m²
- Land areaminimum 0.01 m²
- 2,000 m²
- Development charge on landminimum 0 per m²
- 300 per m²
Results
- Total development charges
- $4,600,000.00
- Charge on built-up area
- $4,000,000.00
- Charge on land area
- $600,000.00
- Effective charge per built-up square metre
- $920.00
Step by step
- 1Values used
- 2Development charges
- 3Total development charges= 4,600,000.00
- 4Charge on built-up area= 4,000,000.00
- 5Charge on land area= 600,000.00
- 6Effective charge per built-up square metre= 920.00
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Preliminary estimate only. Development charge rates, bases and exemptions are set by the local authority and must be confirmed before budgeting.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Preliminary estimate only. Development charge rates, bases and exemptions are set by the local authority and must be confirmed before budgeting.
Frequently Asked Questions
How is the Development Charges figure worked out?
Total = built-up area x building rate + land area x land rate. Development charges recover the cost of trunk infrastructure from new development and are commonly levied on both land area and built-up area, at different rates and often varying by zone and use.
Are development charges the same as a betterment levy?
No. Development charges pay for infrastructure the development requires; a betterment levy recovers windfall value created by public action. Many jurisdictions apply both.
What values do I need to enter?
This calculator takes 4 inputs: Built-up area, Development charge on built-up area, Land area, Development charge on land. The pre-filled defaults are a realistic worked example — replace them with your own site or project figures.
Related Calculators
- Area By Coordinates Calculator
- Area By Double Meridian Distance Calculator
- Bearing And Distance From Coordinates Calculator
- Betterment Levy Calculator
- Building Height Limit From Road Width Calculator
- Bus Frequency Requirement Calculator
- Chain Survey Offset Calculator
- Compensation For Land Calculator
- Contour Volume (Prismoidal) Calculator
- Coordinate Transformation Calculator
You might also need
- Area By Coordinates CalculatorAlso in Surveying, GIS & Urban Planning
- Betterment Levy CalculatorAlso in Surveying, GIS & Urban Planning
- Coordinate Transformation CalculatorAlso in Surveying, GIS & Urban Planning
- Intersection Delay CalculatorAlso in Surveying, GIS & Urban Planning
- Parking Turnover CalculatorAlso in Surveying, GIS & Urban Planning
- Road Camber CalculatorAlso in Surveying, GIS & Urban Planning