Field Failure Cost Calculator
Work out field failure cost instantly with clear inputs, formula shown and shareable results.
About Field Failure Cost Calculator
A field failure costs far more than the part: the service visit typically dominates, and customer goodwill or contractual downtime credits can exceed both. Totalling all three shows why detecting a defect in the factory is one to two orders of magnitude cheaper than detecting it in the field.
Formula
Field failure cost
Cost per failure = parts + service visit + goodwill; total = failures x cost per failure
Worked example
With the default values below, Field Failure Cost Calculator returns Total Field Failure Cost of $2,112,000.00. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Field Failuresminimum 0
- 320
- Parts Cost Per Failureminimum 0
- 900
- Service Visit Costminimum 0
- 2,200
- Goodwill And Downtime Creditminimum 0 per failure
- 3,500 per failure
Results
- Total Field Failure Cost
- $2,112,000.00
- Cost Per Failure
- $6,600.00
- Service Share Of Cost
- 33.33%
- Goodwill And Credit Cost
- $1,120,000.00
Step by step
- 1Values used
- 2Field failure cost
- 3Total Field Failure Cost= 2,112,000.00
- 4Cost Per Failure= 6,600.00
- 5Service Share Of Cost= 33.33
- 6Goodwill And Credit Cost= 1,120,000.00
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
How does this compare with in-factory detection?
The rule of ten: a defect costs roughly ten times more at each stage it escapes — design, production, final test, customer. Field cost per defect is commonly 100-1000 times the factory scrap cost.
Should warranty reserve be based on this?
Yes, combined with an expected failure rate curve. Reserve = units under warranty x expected remaining failure probability x cost per failure.
Related Calculators
- Bathtub Curve Failure Rate Calculator
- Cost Of Poor Quality Calculator
- Cost Of Quality Ratio Calculator
- Downtime Cost Calculator
- Embroidery Stitch Count Cost Calculator
- Label Quantity And Cost Calculator
- Lean Waste Cost Calculator
- Maintenance Cost Per Unit Calculator
- Packaging Cost Per Unit Calculator
- Trim Cost Per Garment Calculator
You might also need
- Downtime Cost CalculatorAlso in Manufacturing, Packaging & Textiles
- Cost Of Poor Quality CalculatorAlso in Manufacturing, Packaging & Textiles
- Cost Of Quality Ratio CalculatorAlso in Manufacturing, Packaging & Textiles
- Lean Waste Cost CalculatorAlso in Manufacturing, Packaging & Textiles
- Packaging Cost Per Unit CalculatorAlso in Manufacturing, Packaging & Textiles
- Bathtub Curve Failure Rate CalculatorAlso in Manufacturing, Packaging & Textiles