Haul Truck Cycle Time Calculator
Work out haul truck cycle time instantly with clear inputs, formula shown and shareable results.
About Haul Truck Cycle Time Calculator
Haul cycle time is loaded travel plus empty return plus fixed time for spotting, loading, dumping and queueing. Trips per hour follows directly, and multiplying by payload gives fleet productivity. Fixed time dominates on short hauls, while road grade and rolling resistance dominate on long ones.
Formulas
Cycle time
Cycle = distance x 60 / loaded speed + distance x 60 / empty speed + fixed time
Productivity
Trips per hour = 60 / cycle time
Worked example
With the default values below, Haul Truck Cycle Time Calculator returns Total Cycle Time of 15.604. Change any input above and every figure here is recalculated in your browser.
Inputs used
- One-Way Haul Distanceminimum 0 km
- 2.5 km
- Loaded Travel Speedminimum 0.01 km/h
- 22 km/h
- Empty Return Speedminimum 0.01 km/h
- 35 km/h
- Load, Dump And Manoeuvre Timeminimum 0 minutes
- 4.5 minutes
Results
- Total Cycle Time
- 15.604
- Trips Per Hour
- 3.845
- Loaded Travel Time
- 6.818
- Empty Return Time
- 4.286
Step by step
- 1Values used
- 2Cycle time
- 3Productivity
- 4Total Cycle Time= 15.604
- 5Trips Per Hour= 3.845
- 6Loaded Travel Time= 6.818
- 7Empty Return Time= 4.286
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Where are the biggest cycle time gains?
Road maintenance and grade. Rolling resistance on a poorly maintained haul road can halve loaded speed, and every percent of adverse grade costs several kilometres per hour.
How many trucks does a loader need?
Match factor: trucks required = cycle time / loader loading time. Under-trucking idles the loader; over-trucking creates queues that inflate fixed time.
Related Calculators
- Combined Cycle Efficiency Calculator
- Time Of Use Tariff Savings Calculator
- Ash Content Impact Calculator
- Barrels Of Oil Equivalent Calculator
- Battery Round Trip Efficiency Calculator
- Battery Storage Sizing Calculator
- Betz Limit Power Calculator
- Biogas To Electricity Calculator
- Biomass Energy Yield Calculator
- Blasting Powder Factor Calculator
You might also need
- Combined Cycle Efficiency CalculatorAlso in Energy, Oil, Gas & Mining
- Gas Bill CalculatorAlso in Energy, Oil, Gas & Mining
- Time Of Use Tariff Savings CalculatorAlso in Energy, Oil, Gas & Mining
- Biogas To Electricity CalculatorAlso in Energy, Oil, Gas & Mining
- Blending Octane CalculatorAlso in Energy, Oil, Gas & Mining
- Capacity Factor CalculatorAlso in Energy, Oil, Gas & Mining