Ore Grade Calculator
Work out ore grade instantly with clear inputs, formula shown and shareable results.
About Ore Grade Calculator
Ore grade is contained metal as a percentage of ore mass, or grams per tonne for precious metals where 1% equals 10,000 g/t. What matters commercially is recoverable value per tonne — grade times price times metallurgical recovery — because that is what must cover mining and processing cost.
Formulas
Ore grade
Grade % = contained metal x 100 / ore tonnage; g/t = grade % x 10,000
Recoverable value
Value per tonne = grade x recovery x metal price
Worked example
With the default values below, Ore Grade Calculator returns Ore Grade of 1.5000%. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Metal Containedminimum 0 tonnes
- 15 tonnes
- Ore Tonnageminimum 0 tonnes
- 1,000 tonnes
- Metal Priceminimum 0 per tonne
- 8,500 per tonne
- Metallurgical Recoveryaccepts 0.01–100 %
- 88 %
Results
- Ore Grade
- 1.5000%
- Recoverable Metal
- 13.200
- Recoverable Value Per Tonne Of Ore
- $112.20
- Grade In Grams Per Tonne
- 15,000.0
Step by step
- 1Values used
- 2Ore grade
- 3Recoverable value
- 4Ore Grade= 1.5000
- 5Recoverable Metal= 13.200
- 6Recoverable Value Per Tonne Of Ore= 112.20
- 7Grade In Grams Per Tonne= 15,000.0
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 4 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why quote grade in different units?
Convention follows value density: percent for base metals such as copper and zinc, grams per tonne for gold and platinum, and parts per million or ounces per ton in some jurisdictions. Always state the unit.
What grade is economic?
Entirely dependent on metal price, depth, recovery and scale. Open-pit copper at 0.3% can be economic at large scale while underground gold below 3 g/t often is not.
Related Calculators
- Concentrate Grade Calculator
- Cut Off Grade Calculator
- Ore Reserve Tonnage Calculator
- Ash Content Impact Calculator
- Barrels Of Oil Equivalent Calculator
- Battery Round Trip Efficiency Calculator
- Battery Storage Sizing Calculator
- Betz Limit Power Calculator
- Biogas To Electricity Calculator
- Biomass Energy Yield Calculator
You might also need
- Concentrate Grade CalculatorAlso in Energy, Oil, Gas & Mining
- Cut Off Grade CalculatorAlso in Energy, Oil, Gas & Mining
- Ore Reserve Tonnage CalculatorAlso in Energy, Oil, Gas & Mining
- Gas Bill CalculatorAlso in Energy, Oil, Gas & Mining
- Biogas To Electricity CalculatorAlso in Energy, Oil, Gas & Mining
- Blending Octane CalculatorAlso in Energy, Oil, Gas & Mining
