Structural steel paint quantities start from theoretical coverage, 1000 times volume solids divided by system dry film thickness in microns, then apply a loss factor. Losses of 25-40 percent are normal on open steelwork because of overspray past flanges and the extra film needed on rough blast profiles and edges.
Formulas
Theoretical coverage
m²/L = 1000 x volume solids / total DFT µm
Paint quantity
Litres = area / (theoretical coverage x (1 - loss factor))
Worked example
With the default values below, Paint Coverage For Steel Calculator returns Paint required of 96.15. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Steel surface areaminimum 0.1 m²
- 350 m²
- Total system dry film thicknessminimum 1 µm
- 125 µm
- Volume solidsaccepts 5–100 %
- 65 %
- Application loss allowanceaccepts 0–70 %
- 30 %
Results
- Paint required
- 96.15 L
- Theoretical coverage
- 5.20 m²/L
- Practical coverage
- 3.64 m²/L
- Consumption per square metre
- 0.2747 L/m²
Step by step
- 1Values used
- 2Theoretical coverage
- 3Paint quantity
- 4Paint required= 96.15 L
- 5Theoretical coverage= 5.20 m²/L
- 6Practical coverage= 3.64 m²/L
- 7Consumption per square metre= 0.2747 L/m²
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 4 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
How is the Paint Coverage For Steel figure worked out?
m²/L = 1000 x volume solids / total DFT µm. Structural steel paint quantities start from theoretical coverage, 1000 times volume solids divided by system dry film thickness in microns, then apply a loss factor.
Why does lattice steelwork need more paint per square metre?
Small members have a high edge-to-area ratio, and edges hold less film so they are stripe-coated. Overspray losses are also far higher than on flat plate.
What values do I need to enter?
This calculator takes 4 inputs: Steel surface area, Total system dry film thickness, Volume solids, Application loss allowance. The pre-filled defaults are a realistic worked example — replace them with your own site or project figures.
Related Calculators
- BTU For Room Size Calculator
- Cooling Time For Moulding Calculator
- Cycle Time For Machine Calculator
- K Factor For Bending Calculator
- Pump Sizing For Water Supply Calculator
- Shear Force For Cutting Calculator
- Air Changes Per Hour Calculator
- Air Compressor Sizing Calculator
- Air Conditioner Sizing Calculator
- Air Receiver Tank Size Calculator
You might also need
- K Factor For Bending CalculatorAlso in HVAC, Plumbing & Mechanical Trades
- BTU For Room Size CalculatorAlso in HVAC, Plumbing & Mechanical Trades
- Cooling Time For Moulding CalculatorAlso in HVAC, Plumbing & Mechanical Trades
- Cycle Time For Machine CalculatorAlso in HVAC, Plumbing & Mechanical Trades
- Shear Force For Cutting CalculatorAlso in HVAC, Plumbing & Mechanical Trades
- Bearing Life CalculatorAlso in HVAC, Plumbing & Mechanical Trades