Plaster volume is area times thickness, uplifted for the generous wastage plastering involves: droppings, over-thickness and material left in the mixer. A dry volume factor of 1.27 converts to loose material, which is then split by the mix ratio and the cement share turned into 50 kg bags.
Formulas
Wet volume
m³ = area x thickness x (1 + wastage)
Materials
Dry = wet x 1.27; cement bags = dry / (1 + sand parts) x 1440 / 50
Worked example
With the default values below, Plaster Sand And Cement Calculator returns Cement required of 8.4. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Area to plasterminimum 0.1 m²
- 100 m²
- Plaster thicknessminimum 3 mm
- 12 mm
- Plaster mixone of 1 : 4 cement to sand, 1 : 5 cement to sand, 1 : 6 cement to sand
- 1 : 5 cement to sand
- Wastage allowanceaccepts 0–40 %
- 15 %
Results
- Cement required
- 8.4 bags
- Sand required
- 1.461 m³
- Wet plaster volume
- 1.380 m³
- Dry material volume
- 1.753 m³
Step by step
- 1Values used
- 2Wet volume
- 3Materials
- 4Cement required= 8.4 bags
- 5Sand required= 1.461 m³
- 6Wet plaster volume= 1.380 m³
- 7Dry material volume= 1.753 m³
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
How is the Plaster Sand And Cement figure worked out?
m³ = area x thickness x (1 + wastage). Plaster volume is area times thickness, uplifted for the generous wastage plastering involves: droppings, over-thickness and material left in the mixer.
Why is plaster wastage so high?
Material falls off the trowel and the wall, corners need building out and the specified thickness is a minimum, so the average applied thickness is always greater than nominal.
What values do I need to enter?
This calculator takes 4 inputs: Area to plaster, Plaster thickness, Plaster mix, Wastage allowance. The pre-filled defaults are a realistic worked example — replace them with your own site or project figures.
Related Calculators
You might also need
- Cement Sand Aggregate Quantity CalculatorAlso in Construction & Civil Engineering
- Sand Quantity CalculatorAlso in Construction & Civil Engineering
- Water Cement Ratio CalculatorAlso in Construction & Civil Engineering
- Cut And Fill Volume CalculatorAlso in Construction & Civil Engineering
- Aggregate Tonnage CalculatorAlso in Construction & Civil Engineering
- Asphalt Quantity CalculatorAlso in Construction & Civil Engineering