Connected load is what every appliance would draw if switched on together, which never happens, so a diversity factor of 0.3 to 0.5 gives the actual peak demand. Transformer capacity converts that to apparent power at the expected power factor and adds a margin for growth and for the loss of one transformer in a substation.
Formulas
Peak demand
kW = households x connected load per household x (1 + commercial share) x diversity factor
Transformer capacity
MVA = peak kW / (power factor x 1000) x growth margin
Worked example
With the default values below, Power Demand For Township Calculator returns Peak demand of 15.750. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Number of householdsminimum 1
- 12,000
- Connected load per householdminimum 0.1 kW
- 3 kW
- Demand diversity factoraccepts 0.05–1
- 0.35
- Additional commercial and civic loadaccepts 0–100 %
- 25 %
Results
- Peak demand
- 15.750 MW
- Total connected load
- 45.000 MW
- Transformer capacity required
- 21.000 MVA
- Effective demand per household
- 1.312 kW
Step by step
- 1Values used
- 2Peak demand
- 3Transformer capacity
- 4Peak demand= 15.750 MW
- 5Total connected load= 45.000 MW
- 6Transformer capacity required= 21.000 MVA
- 7Effective demand per household= 1.312 kW
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Preliminary estimate only. Electrical distribution design must be carried out by a qualified engineer to the utility's planning standards.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Preliminary estimate only. Electrical distribution design must be carried out by a qualified engineer to the utility's planning standards.
Frequently Asked Questions
How is the Power Demand For Township figure worked out?
kW = households x connected load per household x (1 + commercial share) x diversity factor. Connected load is what every appliance would draw if switched on together, which never happens, so a diversity factor of 0.3 to 0.5 gives the actual peak demand.
Why is diversity so low for housing?
Because households cook, heat water and use appliances at different times. The larger the number of connections, the lower the diversity factor and the more efficient the network becomes per household.
What values do I need to enter?
This calculator takes 4 inputs: Number of households, Connected load per household, Demand diversity factor, Additional commercial and civic load. The pre-filled defaults are a realistic worked example — replace them with your own site or project figures.
Related Calculators
- Water Demand For Township Calculator
- Sewage Generation For Township Calculator
- Solid Waste For Township Calculator
- Compensation For Land Calculator
- Fleet Size For Headway Calculator
- Housing Demand Estimate Calculator
- Parking Demand Estimate Calculator
- School Requirement For Population Calculator
- Area By Coordinates Calculator
- Area By Double Meridian Distance Calculator
You might also need
- Water Demand For Township CalculatorAlso in Surveying, GIS & Urban Planning
- Sewage Generation For Township CalculatorAlso in Surveying, GIS & Urban Planning
- Solid Waste For Township CalculatorAlso in Surveying, GIS & Urban Planning
- Compensation For Land CalculatorAlso in Surveying, GIS & Urban Planning
- Housing Demand Estimate CalculatorAlso in Surveying, GIS & Urban Planning
- Parking Demand Estimate CalculatorAlso in Surveying, GIS & Urban Planning