Wind Farm Capacity Calculator
Work out wind farm capacity instantly with clear inputs, formula shown and shareable results.
About Wind Farm Capacity Calculator
Installed capacity is simply turbine rating times count, but wake losses of 5-15% mean the array delivers less than the sum of its parts. Layouts typically space turbines 5-9 rotor diameters apart downwind and 3-5 crosswind, which sets the site area and a power density of 3-6 MW per square kilometre.
Formulas
Wind farm capacity
Installed capacity = turbine rating x number of turbines; effective = installed x (1 - wake loss)
Site area
Area = 7D x 4D x turbines, with D the rotor diameter
Worked example
With the default values below, Wind Farm Capacity Calculator returns Installed Capacity of 105.000. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Turbine Ratingminimum 0 MW
- 4.2 MW
- Number Of Turbinesminimum 1
- 25
- Rotor Diameterminimum 0.01 m
- 145 m
- Wake And Array Lossaccepts 0–40 %
- 8 %
Results
- Installed Capacity
- 105.000
- Effective Capacity After Wake Loss
- 96.600
- Indicative Site Area
- 14.718
- Power Density
- 0.0713
Step by step
- 1Values used
- 2Wind farm capacity
- 3Site area
- 4Installed Capacity= 105.000
- 5Effective Capacity After Wake Loss= 96.600
- 6Indicative Site Area= 14.718
- 7Power Density= 0.0713
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 4 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why are wake losses unavoidable?
A turbine extracts energy from the wind and leaves a slower, more turbulent wake. Downwind turbines see reduced wind speed, and because power varies with the cube of speed, even a small deficit costs output.
Does the land become unusable?
No. Turbine foundations and access roads occupy 1-3% of the site area; the rest remains available for farming or grazing, which is why wind leases coexist with agriculture.
Related Calculators
- Capacity Factor Calculator
- Conveyor Capacity Calculator
- Pipeline Flow Capacity Calculator
- Solar Farm Land Requirement Calculator
- Solar Farm Output Calculator
- Storage Tank Capacity Calculator
- Weibull Wind Distribution Calculator
- Wind Speed At Hub Height Calculator
- Ash Content Impact Calculator
- Barrels Of Oil Equivalent Calculator
You might also need
- Capacity Factor CalculatorAlso in Energy, Oil, Gas & Mining
- Conveyor Capacity CalculatorAlso in Energy, Oil, Gas & Mining
- Pipeline Flow Capacity CalculatorAlso in Energy, Oil, Gas & Mining
- Solar Farm Output CalculatorAlso in Energy, Oil, Gas & Mining
- Storage Tank Capacity CalculatorAlso in Energy, Oil, Gas & Mining
- Weibull Wind Distribution CalculatorAlso in Energy, Oil, Gas & Mining