Pipeline Flow Capacity Calculator
Work out pipeline flow capacity instantly with clear inputs, formula shown and shareable results.
About Pipeline Flow Capacity Calculator
Pipeline capacity is flow area times velocity, converted to barrels per day. Design velocity is limited at the top by erosion and pressure drop — typically 3 to 8 ft/s for liquids — and at the bottom by the need to keep water and solids entrained rather than settling in low points.
Formula
Pipeline capacity
Q (bbl/d) = flow area (ft2) x velocity (ft/s) x 86,400 / 5.6146
Worked example
With the default values below, Pipeline Flow Capacity Calculator returns Pipeline Throughput of 290,065. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Internal Diameterminimum 0.01 inches
- 24 inches
- Design Velocityminimum 0.01 ft/s
- 6 ft/s
- Operating Hours Per Yearminimum 0.01 hours
- 8,400 hours
- Fluidone of Crude oil, Refined product, Water
- Crude oil
Results
- Pipeline Throughput
- 290,065
- Annual Throughput
- 101.5229
- Pipe Flow Area
- 3.14159
- Mass Flow Rate
- 3,664,354
Step by step
- 1Values used
- 2Pipeline capacity
- 3Pipeline Throughput= 290,065
- 4Annual Throughput= 101.5229
- 5Pipe Flow Area= 3.14159
- 6Mass Flow Rate= 3,664,354
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or fees or charges into account.
- Figures are rounded for display to 5 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why is high velocity a problem?
Pressure drop rises with the square of velocity, so pumping cost escalates, and erosion-corrosion accelerates where solids or water are present, particularly at bends and fittings.
What velocity is too low?
Below about 3 ft/s water can settle at low points and cause under-deposit corrosion, and wax or sand can accumulate. Batch pigging is used where low velocity is unavoidable.
Related Calculators
You might also need
- Capacity Factor CalculatorAlso in Energy, Oil, Gas & Mining
- Conveyor Capacity CalculatorAlso in Energy, Oil, Gas & Mining
- Choke Size Flow CalculatorAlso in Energy, Oil, Gas & Mining
- Pipeline Pressure Drop CalculatorAlso in Energy, Oil, Gas & Mining
- Pipeline Wall Thickness CalculatorAlso in Energy, Oil, Gas & Mining
- Storage Tank Capacity CalculatorAlso in Energy, Oil, Gas & Mining
