Critical Path Timing Calculator
Work out critical path timing instantly with clear inputs, formula shown and shareable results.
About Critical Path Timing Calculator
The critical path is the longest logic chain between registers: stages times delay per stage plus wire delay, then derated for process, voltage and temperature variation. On-chip variation derates of 5-10% are typical and are applied before the path is declared timing-clean.
Formula
Critical path
delay = stages x delay per stage + wire delay, x (1 + OCV derate)
Worked example
With the default values below, Critical Path Timing Calculator returns Critical path delay of 885.60. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Logic stages on the path
- 8 stages
- Average delay per stage
- 85 ps
- Total wire delay on the path
- 140 ps
- Timing derate for variation
- 8 %
Results
- Critical path delay
- 885.60 ps
- Logic delay
- 680.00 ps
- Delay before derating
- 820.00 ps
- Frequency limit
- 1,129.2 MHz
Step by step
- 1Values used
- 2Critical path
- 3Critical path delay= 885.60 ps
- 4Logic delay= 680.00 ps
- 5Delay before derating= 820.00 ps
- 6Frequency limit= 1,129.2 MHz
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why derate at all?
Because a chip must work at every corner of process, voltage and temperature. Derating covers within-die variation that corner analysis alone misses.
How do I shorten a critical path?
Reduce logic depth by restructuring, retime by moving registers, upsize critical gates, or pipeline the path into two shorter ones.
Related Calculators
You might also need
- Amdahl Speedup CalculatorAlso in Semiconductor, VLSI & Hardware Design
- ATE Throughput CalculatorAlso in Semiconductor, VLSI & Hardware Design
- Bitstream Size CalculatorAlso in Semiconductor, VLSI & Hardware Design
- Burn In Time CalculatorAlso in Semiconductor, VLSI & Hardware Design
- Bus Bandwidth CalculatorAlso in Semiconductor, VLSI & Hardware Design
- Contact Resistance CalculatorAlso in Semiconductor, VLSI & Hardware Design
