About Dewatering Pump Sizing Calculator
Hydraulic power is flow times head times density times gravity. Dividing by pump efficiency gives shaft power and by motor efficiency the motor rating. Mine dewatering must be sized on peak inflow with standby capacity, because losing dewatering floods the workings and can be catastrophic.
Formulas
Pump power
Hydraulic power (kW) = flow (m3/h) x 1000 x 9.81 x head (m) / 3,600,000
Motor rating
Motor kW = hydraulic power / pump efficiency / motor efficiency
Worked example
With the default values below, Dewatering Pump Sizing Calculator returns Motor Rating Required of 238.071. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Mine Water Inflowminimum 0 m3/hour
- 250 m3/hour
- Total Pumping Headminimum 0.01 m
- 180 m
- Pump Efficiencyaccepts 1–100 %
- 72 %
- Standby And Peak Marginaccepts 0–100 %
- 30 %
Results
- Motor Rating Required
- 238.071
- Hydraulic Power
- 159.413
- Design Flow
- 325.00
- Energy Per Cubic Metre Pumped
- 0.6813
Step by step
- 1Values used
- 2Pump power
- 3Motor rating
- 4Motor Rating Required= 238.071
- 5Hydraulic Power= 159.413
- 6Design Flow= 325.00
- 7Energy Per Cubic Metre Pumped= 0.6813
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 4 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Loss of mine dewatering can cause flooding and loss of life. Dewatering systems require redundancy, standby power and monitoring under the mine's emergency plan.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Loss of mine dewatering can cause flooding and loss of life. Dewatering systems require redundancy, standby power and monitoring under the mine's emergency plan.
Frequently Asked Questions
Why such a large standby margin?
Inflow varies with rainfall and with intersection of new water-bearing structures, and pumps fail. Standard practice is full standby capacity, not just a margin, on critical dewatering duties.
Does staging help on high heads?
Yes. Multistage pumps or booster stations in series keep individual pump pressures within casing limits and allow flexible operation as the mine deepens.
Related Calculators
- Battery Storage Sizing Calculator
- Electrolyser Sizing Calculator
- Pump Station Spacing Calculator
- Separator Sizing Calculator
- Solar Inverter Sizing Calculator
- String Sizing For Solar Calculator
- Ash Content Impact Calculator
- Barrels Of Oil Equivalent Calculator
- Battery Round Trip Efficiency Calculator
- Betz Limit Power Calculator
You might also need
- Electrolyser Sizing CalculatorAlso in Energy, Oil, Gas & Mining
- Separator Sizing CalculatorAlso in Energy, Oil, Gas & Mining
- Battery Storage Sizing CalculatorAlso in Energy, Oil, Gas & Mining
- Pump Station Spacing CalculatorAlso in Energy, Oil, Gas & Mining
- Solar Inverter Sizing CalculatorAlso in Energy, Oil, Gas & Mining
- Gas Bill CalculatorAlso in Energy, Oil, Gas & Mining