Skip to content
ENExplore Calculators

Paver Quantity

Free Paver Quantity calculator with clear step-by-step results.

About Paver Quantity

The repeating unit of a paved surface is the paver plus its joint, so a 200 × 100 mm block on a 3 mm joint occupies 203 × 103 mm and about 48 units fill a square metre. Cutting waste is higher than for brickwork because borders, radii and herringbone edges all need part units, and a cut paver rarely yields two usable pieces.

Formulas

Pavers per square metre

Pavers/m² = 1 ÷ ((length + joint) × (width + joint))

Order quantity

Pavers to order = ceil(area × pavers/m² × (1 + waste))

Worked example

With the default values below, Paver Quantity returns Pavers to Order of 1,550. Change any input above and every figure here is recalculated in your browser.

Inputs used

Paved areaminimum 0 m²
30 m²
Paver lengthminimum 10 mm
200 mm
Paver widthminimum 10 mm
100 mm
Joint widthaccepts 0–30 mm
3 mm
Cutting wasteaccepts 0–50 %
8 %

Results

Pavers to Order
1,550 pavers
Pavers Laid
1,435 pavers
Pavers per m²
47.8
Jointing Sand
120 kg

Step by step

  1. 1Values used
  2. 2Pavers per square metre
  3. 3Order quantity
  4. 4Pavers to Order= 1,550 pavers
  5. 5Pavers Laid= 1,435 pavers
  6. 6Pavers per m²= 47.8
  7. 7Jointing Sand= 120 kg

Assumptions and limits

  • The result is derived only from the 5 inputs listed above. Anything not among them is not part of the calculation.
  • In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
  • Figures are rounded for display to 1 decimal place, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
  • This is a surface take-off only. Sub-base depth, bedding, edge restraint and drainage falls must follow the paving design and local standards, particularly for vehicle loading.

How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.

This is a surface take-off only. Sub-base depth, bedding, edge restraint and drainage falls must follow the paving design and local standards, particularly for vehicle loading.

Frequently Asked Questions

Why does the joint change the count?

Joints add up. On a small 200 × 100 paver a 3 mm joint removes roughly 3% of the units per square metre, which is a meaningful number of pavers across a driveway.

How much waste should I allow for a pattern?

5% for a straight stretcher bond, 8-10% for herringbone or basketweave, and up to 15% where there are curves, circles or many obstacles.

Should I order extra beyond the waste allowance?

Yes — keep a small stock of spares from the same batch. Later production runs differ in colour, so a repair made years later will show.