Polyhouse Cost Calculator
Work out polyhouse cost instantly with clear inputs, formula shown and shareable results.
About Polyhouse Cost Calculator
Polyhouse capital cost is area x rate per square metre, which varies with structure type — bamboo and wooden houses are cheapest, galvanised iron naturally ventilated houses mid-range and fan-and-pad climate-controlled houses several times more. Netting off subsidy and spreading the balance over the structure life gives the annual capital charge the crop must cover.
Formula
Polyhouse cost
Gross = area x cost per m2; net = gross x (1 - subsidy %); annualised = net / life in years
Worked example
With the default values below, Polyhouse Cost Calculator returns Net Investment After Subsidy of $550,000.00. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Polyhouse Areaminimum 1 m2
- 1,000 m2
- Construction Costminimum 0 per m2
- 1,100 per m2
- Subsidy Availableaccepts 0–95 %
- 50 %
- Structure Lifeminimum 1 years
- 15 years
Results
- Net Investment After Subsidy
- $550,000.00
- Gross Construction Cost
- $1,100,000.00
- Subsidy Amount
- $550,000.00
- Annualised Capital Cost
- $36,666.67
Step by step
- 1Values used
- 2Polyhouse cost
- 3Net Investment After Subsidy= 550,000.00
- 4Gross Construction Cost= 1,100,000.00
- 5Subsidy Amount= 550,000.00
- 6Annualised Capital Cost= 36,666.67
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
- Subsidy rates, ceilings and eligibility vary by scheme, state and category of beneficiary. Confirm current terms with the horticulture department before committing.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Subsidy rates, ceilings and eligibility vary by scheme, state and category of beneficiary. Confirm current terms with the horticulture department before committing.
Frequently Asked Questions
What does the cost per square metre cover?
Structure, cladding film, doors and basic ventilation. Irrigation, fertigation, shade nets, insect screens and a water source are usually extra and can add 20-40%.
How often must the film be replaced?
UV-stabilised polythene lasts 3-5 years depending on grade and sunlight. Budget a recurring cost for recladding separately from the structure life.
Related Calculators
- Cold Chain Energy Cost Calculator
- Cost Of Cultivation Calculator
- Farm Electricity Cost Calculator
- Plantation Cost Calculator
- Tractor Operating Cost Calculator
- Transport Cost For Produce Calculator
- Wage Cost For Farm Work Calculator
- Aquaponics Fish To Plant Ratio Calculator
- Beekeeping Hive Yield Calculator
- Biofertiliser Dose Calculator
You might also need
- Cost Of Cultivation CalculatorAlso in Agriculture, Livestock & Rural
- Plantation Cost CalculatorAlso in Agriculture, Livestock & Rural
- Farm Electricity Cost CalculatorAlso in Agriculture, Livestock & Rural
- Tractor Operating Cost CalculatorAlso in Agriculture, Livestock & Rural
- Cold Chain Energy Cost CalculatorAlso in Agriculture, Livestock & Rural
- Transport Cost For Produce CalculatorAlso in Agriculture, Livestock & Rural
