About Control Plan Frequency Calculator
Control plan frequency should follow capability and consequence. A highly capable process (Cpk above 1.67) needs infrequent verification, while a marginal one needs frequent checks. The interval is then tightened where an escaped defect costs far more than an inspection, since the units produced between checks are all at risk if the process shifts.
Formulas
Base interval from capability
Cpk >= 1.67: 4 h; 1.33-1.67: 2 h; 1.0-1.33: 1 h; below 1.0: 0.5 h
Cost adjustment
Interval = base x (20 / (defect cost / inspection cost))^0.25, bounded to 0.25-8 hours
Worked example
With the default values below, Control Plan Frequency Calculator returns Inspection Interval of 1.682. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Production Rateminimum 0.01 units/hour
- 240 units/hour
- Process Capability (Cpk)minimum 0.1
- 1.33
- Cost Of An Escaped Defectminimum 0
- 1,800
- Cost Per Inspectionminimum 0.01
- 45
Results
- Inspection Interval
- 1.682
- Checks Per 8-Hour Shift
- 4.76
- Units Between Checks
- 404
- Defect To Inspection Cost Ratio
- 40.0
Step by step
- 1Values used
- 2Base interval from capability
- 3Cost adjustment
- 4Inspection Interval= 1.682
- 5Checks Per 8-Hour Shift= 4.76
- 6Units Between Checks= 404
- 7Defect To Inspection Cost Ratio= 40.0
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax or compounding frequency into account.
- Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
Why not just inspect every unit?
Because 100% inspection is typically only 80-95% effective, costs a great deal, and does nothing to improve the process. Capable processes with periodic verification outperform incapable ones with full inspection.
What about first-off and last-off checks?
They are mandatory regardless of interval. Setup is where most special-cause variation enters, and a last-off check bounds the quarantine if a problem is found.
Related Calculators
- Double Sampling Plan Calculator
- 5S Audit Score Calculator
- Accelerated Ageing Time Calculator
- Acceptance Number (AQL) Calculator
- Availability And Performance Rate Calculator
- Batch Size Optimisation Calculator
- Bathtub Curve Failure Rate Calculator
- Bottle Fill Volume Calculator
- Bottleneck Identification Calculator
- Bottling Output Per Hour Calculator
You might also need
- Double Sampling Plan CalculatorAlso in Manufacturing, Packaging & Textiles
- 5S Audit Score CalculatorAlso in Manufacturing, Packaging & Textiles
- Bottleneck Identification CalculatorAlso in Manufacturing, Packaging & Textiles
- Calibration Interval CalculatorAlso in Manufacturing, Packaging & Textiles
- Cap Torque CalculatorAlso in Manufacturing, Packaging & Textiles
- Changeover Time CalculatorAlso in Manufacturing, Packaging & Textiles