Resource Levelling Calculator
Work out resource levelling instantly with clear inputs, formula shown and shareable results.
About Resource Levelling Calculator
Resource levelling smooths peaks to fit available capacity, and where the peak exceeds availability the schedule must extend. Total effort divided by available resources gives the theoretical minimum levelled duration — the floor no amount of sequencing can beat.
Formulas
Average demand
Average demand = Total effort / Project duration
Levelled duration
Levelled duration = Total effort / Available resources
Worked example
With the default values below, Resource Levelling Calculator returns Duration after levelling of 80.0. Change any input above and every figure here is recalculated in your browser.
Inputs used
- Total effort
- 640 person-days
- Project duration
- 90 days
- Peak resource demand
- 14
- Resources available
- 8
Results
- Duration after levelling
- 80.0
- Average resource demand
- 7.11
- Extension caused by levelling
- 0.0
- Peak demand above availability
- 6.0
Step by step
- 1Values used
- 2Average demand
- 3Levelled duration
- 4Duration after levelling= 80.0
- 5Average resource demand= 7.11
- 6Extension caused by levelling= 0.0
- 7Peak demand above availability= 6.0
Assumptions and limits
- The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
- In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
- Figures are rounded for display to 2 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.
How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.
Frequently Asked Questions
What is the difference between levelling and smoothing?
Levelling allows the end date to move to respect resource limits; smoothing keeps the end date and uses float to reduce peaks.
Why does the average demand matter?
Because if the average already exceeds availability, no sequencing helps — the project is under-resourced, not badly scheduled.
Related Calculators
You might also need
- CGPA CalculatorAlso in Work, Career, HR & Education Admin
- eNPS CalculatorAlso in Work, Career, HR & Education Admin
- SGPA CalculatorAlso in Work, Career, HR & Education Admin
- Appraisal Score CalculatorAlso in Work, Career, HR & Education Admin
- Apprenticeship Wage CalculatorAlso in Work, Career, HR & Education Admin
- Burndown Projection CalculatorAlso in Work, Career, HR & Education Admin