Skip to content
ENExplore Calculators

Full Time Equivalent Calculator

Work out full time equivalent instantly with clear inputs, formula shown and shareable results.

About Full Time Equivalent Calculator

FTE converts a mixed workforce into a common unit by dividing total hours worked by standard full-time hours. Headcount and FTE diverge whenever part-time working is significant, and budgets should be built on FTE while people processes run on headcount.

Formulas

Total FTE

FTE = Total hours worked / Standard full-time hours

Part-time FTE

Part-time FTE = Total FTE - Full-time staff count

Worked example

With the default values below, Full Time Equivalent Calculator returns Total full-time equivalents of 35.50. Change any input above and every figure here is recalculated in your browser.

Inputs used

Total hours worked by all staff per week
1,420
Standard full-time hours per week
40
Part-time staff included
14
Full-time staff included
28

Results

Total full-time equivalents
35.50
Headcount
42
FTE contributed by part-time staff
7.50
Average FTE per person
0.845

Step by step

  1. 1Values used
  2. 2Total FTE
  3. 3Part-time FTE
  4. 4Total full-time equivalents= 35.50
  5. 5Headcount= 42
  6. 6FTE contributed by part-time staff= 7.50
  7. 7Average FTE per person= 0.845

Assumptions and limits

  • The result is derived only from the 4 inputs listed above. Anything not among them is not part of the calculation.
  • In particular, this calculator does not take inflation, tax, fees or charges or compounding frequency into account.
  • Figures are rounded for display to 3 decimal places, so totals built from several rounded parts can differ slightly from the unrounded arithmetic.

How these calculators are built and tested is described on the Methodology page. If a figure looks wrong, please report it.

Frequently Asked Questions

Should overtime count towards FTE?

No for establishment purposes — FTE measures contracted capacity. Track overtime separately as a signal of under-establishment.

Which should I report to the board?

FTE for cost and capacity, headcount for engagement, attrition and organisational reach. Reporting only one always misleads.

Full Time Equivalent Calculator | Calcrivo